Forward
Free tool · No signup

Excavation cubic yards

In-place + loose cubic yards for a rectangular excavation, with the swell factor that turns 100 cy in the ground into ~115-135 cy in the dump truck. Common soil types covered.

In-place (bank)
711.1 cu yd
For cut/fill balance.
Loose (trucks)
910.2 cu yd
For haul-off billing at +28% swell.
Swell factors (in-place → loose)
  • Loam / silt: +15-25%
  • Common clay: +25-30%
  • Sand + gravel: +12-15%
  • Heavy / wet clay: +30-40%
  • Rock (blasted): +50-75%

Truck volume billing uses the loose number; site cut + fill balance uses the in-place number.

Built by Forward

Forward runs excavation cubic yards, asphalt tonnage, concrete yards, rebar LF, and the full NEC/IBC/IMC catalog over text.